Monday, February 1, 2010

New Stuff on the NYC!



This is the newly revised area where the Ore Boat will dock. I have revised the track arrangement, added (4) switches and revised the control panels, and built the Heulett Unloader kit from Walthers. Needs painted still, but almost done.


From this angle you can see the elevated section, and the revised siding at the base of the quarry.




This pic shows that I have in fact installed a spline roadbed test section, after elevating the Westfield gravel quarry about 3 inches or so. Scott was right, it does look much better this way.




















1 comment:

  1. Nice work Keith! Man, you get a lot done quickly. So tell us how the assembly of the ore eating machine went?

    ReplyDelete

Write your comment here!