In attendance were:
Coalfinger Ken
Glue Bob
Band Camp Mark
Steve-bay
Packrat Paul
Concrete Keith
Popsicle Rick
Wade's work goals for the night included: running buss wires, putting down cork roadbed, and installing track.
Keith & Mark are installing turnouts and track while Wade is deciding on track location.
Ken, Paul & Wade are discussing all of the fine points of layout design.
Bob was a little out of his element (glue) as both the cork and track are being installed using track nails - no glue! Here he's figuring the radius on the curves, which had to be reduced from the desired 30" to 29" to fit the layout.
Steve couldn't figure out why he was having trouble drilling holes for the buss wiring until we told he that the sharp drill bit thingy was to go against the wood! ;-) Both Steve and Rick made short work of drilling two seperate holes ( one for buss, one for control) through each of the 2" x 4" boards and then stringing the buss wire.
And now let us pray............. acutally, Mark is thinking about the cork in a turnout area.
Steve couldn't figure out why he was having trouble drilling holes for the buss wiring until we told he that the sharp drill bit thingy was to go against the wood! ;-) Both Steve and Rick made short work of drilling two seperate holes ( one for buss, one for control) through each of the 2" x 4" boards and then stringing the buss wire.
And now let us pray............. acutally, Mark is thinking about the cork in a turnout area.
No comments:
Post a Comment
Write your comment here!